§ 30-230. Restrictions on private on-site wastewater permits.  


Latest version.
  • No private on-site wastewater permit authorizing the construction, alteration or extension of a private on-site wastewater system shall be transferable. No authorization for construction of a new private on-site wastewater system granted by a private on-site wastewater permit shall be valid for more than 12 months from the date of issuance. Private on-site wastewater permits for altering or extending an on-site wastewater system shall be valid for no more than six months from the date of issuance.

(Code 1988, § 30-278; Ord. No. O-46-05, § 1, 6-2-2005)